Wednesday, November 20, 2013

Final stage - paint walls, ceiling tiles

Hello everyone,

Last 3 weeks have been mailing dry wall finishing and painting the walls.  There hasn't been much work done on the outside so I haven't updated any pictures.  But today I went out and took some updated pictures of the painted walls and the new wall signs on the building.  The main sign by the road is still not up and the exterior lights are not in, but the awnings are in.

I am hoping that we will have the ceiling tiles done and the flooring started next week as well as the cabinetry by next week.  We have a finish date planned for Dec 9. 

Here are some updated pictures:







Se as you can see, we still have some work to do inside, even though the outside is about done.  We will have carpet and flooring, ceiling tiles and cabinetry put in the next week or two.  We still have fixtures to install as well.  But we should be able to get everything done by Dec 9, God Willing!  I will update again once the flooring and cabinetry are done. - NKS