Saturday, October 26, 2013

Drywalls going up. stonework and parking lot just about done.

Hello everyone,

So we are coming to the home stretch this next week.  Drywall is up and is being finished, parking lot asphalt was just finished yesterday, just needs the lines painted on now, stone work done on the entrance, sign base going up.  Expect to finish in one month!  We are on schedule, even slightly ahead of schedule.  Of course, there is still a lot that needs to be finished up inside with paint, flooring, and cabinetry.  Here are the updated pictures:

The brick is painted and the sign base is being constructed:

Consumers Energy connected the gas and electricity last week:

Parking lot finished, except for the lines:

Parking lot and sidewalk done:

Sign base still needs some work:

Waiting room drywall being finished:

Front desk checkout station:

Operatory rear cabinetry area:

Hallway from the staff lounge:

So the goal for next week is to finish up with the drywall and start on the painting.  Ceiling should also be started by next week, we will be placing ceiling tiles.  We also want the exterior to finish up, which includes the sign base and pillar before the weather gets too cold, we are already seeing freezing temperatures.  Hopeufully in one month we will be done! stay tuned. - NKS

1 comment: