This past week the exterior EIFS is being finished up.  Still needs to be painted on part of the building but mostly up.  Next week the cultured stone will be placed.  In the interior the wall studs are being put up.  The electrical and low voltage wiring has been started and hopefully next week the drywall will start to go up.  Also, not showing in the pictures, there was a lot of parking lot work done.  The storm drain pipes were placed and a storn drain and man hole was placed.  The storm drains were connected to the current drain in my current building parking lot.  This has caused a big mess in our parking lot.  Hopefully, this will be finished within the next week or two.

Here are updated pics:









SO next week, hopefully, we will have pics with cultured stone in place and some drywall going up.  We are on schedule and hopefully may be done by end of November! - NS