It's been a while since the last post.  There hasn't been that much visual changes on a day to day basis so that is why I haven't updated the pictures recently.  Most of the work the past two weeks is related to electrical and plumbing and wiring work.  A lot of that work is involved in the building.  But at this point, the sidewalks have been poured and the base asphalt has been placed.  The cultured stone is going up at the entrance.  In the interior, the drywall is going up and the insulation is done.  We are looking at about 6 weeks to finish hopefully.

Here are the updated pics:

Parking lot and sidewalk:



 Cultured stone:


Poured sidewalk:


Waiting room:


Front desk area:


Hallway:


Hopefully within the next week to 10 days, we will finish up with the exterior.  The weather has been great so far, although it's beginning to get cold and wet.  If we can get a few more days of sun, we will be set.  We plan on placing the final asphalt layer this Friday and Saturday, weather permitting.  Will update next week when the exterior gets done God willing. - NKS

No comments:

Post a Comment