Wednesday, September 4, 2013

Framing complete - roof complete

Hello Everyone,

Last week the roofing/electrical and plumbing was placed and this week the floor will be poured.  The next two weeks should have a lot done. Once the concrete floor is set, the walls will be put up.  There will be parking lot work and and brick work done this next week as well.  It's amazing how high the building looks because it's one a hill and on high grading.  With the framing done, it's finally taking the shape that it will be when it is finished.

Here are some roof pictures and the finished framing pictures.


The building is finally taking shape.


Rooftop view of Flushing:


Roof work:


This picture is from the sidewalk.  You can see how high the building looks because it's on a higher grade.



Here is the framing before the plumbing was placed:


Here is after the plumbing was placed:


And here:


I will update very soon with the concrete floor, which is being poured in today and tomorrow when the wall studs are placed,  - NS